Deep trenchers are becoming the method of choice for many contractors. With this new method, your job sites become less cluttered and much more accessible. This is an excellent dewatering application.

The horizontal dewatering sock is installed below our work area and pumped from the outside to enhance your access. Horizontal dewatering can be applied to excavations with up to 18 feet of water!

Construction dewatering on building sites or sanitary sewer installations can be efficiently handled with the horizontal method. In finer soils or in clay bottom jobs, our horizontal tile can be bedded in stone to maximize its efficiency.

Building sites, sanitary sewers, borrow pits and several other applications can benefit from this new technology.

HDPE Force Main Installations

With our spectra physics laser system, our trencher can install HDPE force main on grade up to 13 feet deep.

With much greater speed and accuracy than the conventional backhoe method, this new installation technique keeps your job on schedule.
We can install the pipe below the ground water level without any dewatering, still maintaining line and grade.

With the work platform being only 10 feet wide, your clean up is minimal.
All these great features add up to substantial cost savings and increased profitability.