Deep trenchers are becoming the method of choice for many
contractors. With this new method, your job sites become less
cluttered and much more accessible. This is an excellent dewatering
application.
The horizontal dewatering sock is installed below our work
area and pumped from the outside to enhance your access. Horizontal
dewatering can be applied to excavations with up to 18 feet
of water!
Construction dewatering on building sites or sanitary sewer
installations can be efficiently handled with the horizontal
method. In finer soils or in clay bottom jobs, our horizontal
tile can be bedded in stone to maximize its efficiency.
Building sites, sanitary sewers, borrow pits and several
other applications can benefit from this new technology.
HDPE Force Main Installations
With our spectra physics laser system, our trencher can install
HDPE force main on grade up to 13 feet deep.
With much greater speed and accuracy than the conventional
backhoe method, this new installation technique keeps your
job on schedule.
We can install the pipe below the ground water level without
any dewatering, still maintaining line and grade.
With the work platform being only 10 feet wide, your clean
up is minimal.
All these great features add up to substantial cost savings
and increased profitability.
|